JSW_postassessment_Metallurgy

JSW_Boiler Metallurgy_ILT_ Post Assessment

JSW_Boiler Metallurgy_ILT_ Post Assessment

The number of attempts remaining is 2

1 / 20

1. Post weld Heating is Required to ________________

2 / 20

2. What is irrelevant to Boiler Metallurgy

3 / 20

3. With the reduction in the mean stress, the fatigue limit of the material

4 / 20

4. Which one of the following is iron impurities ?

5 / 20

5. On which cycle does a modern thermal power plant operate?

6 / 20

6. Super Heater / Re heater tube of boiler is made up of which material

7 / 20

7. The Purpose of Heat Treatment is _____________________

8 / 20

8. Safe-life design relies on _______

9 / 20

9. Which Failure mechanism of boiler tube is Related to High Temp ________ .

10 / 20

10. HAZ is related ________________-

11 / 20

11. Which of the following elements were responsible for failure of the Titanic ship? Hint …..The steel used in the hull was high in sulfur, phosphorus In the freezing -2°C Atlantic waters, this caused a "ductile-to-brittle transition," meaning the metal shattered like glass upon impact instead of bending or deforming.

12 / 20

12. Which part of Boiler operate under highest Fluegas Temp

13 / 20

13. Which material is recommonded out of given tube for Economizer ?

14 / 20

14. What is Correct Nomenclature for identify for Tube or Pipe is correct?

15 / 20

15. Ductility of a material is defined as its ability to undergo significant permanent deformation in ______________

16 / 20

16. Which of the following is not a mechanical property of Material

17 / 20

17. What is RLA in cotext of Indian Boiler Regulation

18 / 20

18. Which alloying element improve corrosion Resistance property of carbon steel ?

19 / 20

19. Waterwall of boiler is made up of which material

20 / 20

20. Which tube `s design temp is Lowest of all option

Your score is